The Prose Kent Station project highlights Team Nelson’s utility expertise during one of the most critical phases of urban infrastructure work: final water tie-in connections.

Kent, WA 98032

Final Water Tie-Ins for Urban Infrastructure

Located in Kent, Washington, this phase supported ongoing mixed-use development within the Kent Station area. The work required controlled excavation, precise sequencing and careful integration with existing utility systems.

Final tie-ins demand field teams that understand both the technical requirements and the operational risks of working in active urban environments. Team Nelson completed the work with the coordination and discipline required to maintain safety, efficiency and infrastructure reliability.

This case demonstrates how Team Nelson brings performance-focused excavation and utility execution to essential infrastructure work that has to be done right the first time.