UNDERGROUND UTILITIES AND CONCRETE
18 May 2026
by Team Nelson
The Totem Lake project highlights Team Nelson’s ability to execute detailed underground utility work in a demanding urban environment where coordination, safety and precision all matter. Located in Kirkland, Washington, the project required disciplined site oversight and careful execution across multiple phases of underground infrastructure. Work included precision sewer excavation, engineered shoring and the controlled installation of sand cover over critical dry utilities. From crane-level site visibility to the details happening below grade, the Totem Lake project shows how Team Nelson manages complexity with a performance-driven mindset. Every phase required the right people, the right sequencing and the right field…
The Totem Lake project highlights Team Nelson’s ability to execute detailed underground utility work in a demanding urban environment where coordination, safety and precision all matter.
Located in Kirkland, Washington, the project required disciplined site oversight and careful execution across multiple phases of underground infrastructure. Work included precision sewer excavation, engineered shoring and the controlled installation of sand cover over critical dry utilities.
From crane-level site visibility to the details happening below grade, the Totem Lake project shows how Team Nelson manages complexity with a performance-driven mindset. Every phase required the right people, the right sequencing and the right field decisions to keep work moving safely and efficiently.
This project is a strong example of how Team Nelson combines underground utility expertise with disciplined execution to help complex developments move forward with confidence.